A $15 billion, 1.4 GW data-centre proposal is being assessed for Gregadoo, Wagga Wagga, and we need your help to stop it.
What's Proposed
A $15 billion hyperscale data-centre campus is proposed for Gregadoo on Ashfords Road, on the outskirts of Wagga Wagga.The 24/7 facility would contain four massive single-storey buildings, each approximately the size of a supermarket distribution centre, with a proposed maximum power demand of 1.4 gigawatts (GW).But the proposal is far more than four buildings.It includes:* 384 backup diesel generators
* Approximately 6,400 tonnes of diesel storage
* Two large-scale batteries
* Major electrical infrastructure and a new grid connection
* Extensive cooling infrastructureThe site is council-owned land immediately beside the Gregadoo landfill, and currently designated RU1 Primary Production under the Wagga Wagga Local Environmental Plan 2010 not industrial land.But this isn't an isolated rural location.The proposed facility is less than 5 km from some of neighbouring Lake Albert's most populated areas, which including a retirement village, disability services, primary and secondary schools, a child care centre, along with the new proposed Rowan subdivision — a major residential development which will include thousands of homes.
Be Curious
Get Informed
Data centres are complex developments with potential impacts across energy, water, infrastructure, the environment and surrounding communities.We’re gathering information from a range of sources to help you understand what data centres are, how they operate, and what their potential impacts can be.Read the information. Check the sources. Ask questions. Make up your own mind.
Council's $470 Million Backflip
Despite growing concern, mounting petition signatures, and requests for the data centre to be raised at the WWCC meeting, councillors instead decided to hold a closed door meeting to vote on the sale of land previously acquired for Wagga Wagga waste management.Why did they rush to vote on the sale? Why did they do it behind closed doors? And why did they backflip on the following information shared at the WWCC meeting on September 8th 2025?
[Council is aware that Gregadoo Waste Management Centre will reach capacity in 2076. Prior to acquiring 232 Ashfords Road, Council undertook an economic analysis which found that purchasing the property now would avoid an estimated $470M in future capital and operational costs (or $137M in today’s dollars) associated with closing and remediating the existing facility and establishing and equipping a new greenfield Waste Management Centre.]
Another Data Centre is Already Being Proposed
One proposal has already sparked community outrage.
Now Wagga Wagga could be facing two.
On 14 October 2026, ABC Radio and The Daily Advertiser reported that another data centre is being proposed for Wagga Wagga, reportedly on land near the proposed CDC development at Gregadoo.The second proposal is understood to involve American company, IREN, with reports suggesting land has already been purchased in the Redbank Road and Plumpton Road area.While we're still yet to see details of the full scale, infrastructure requirements, and environmental impacts of this second proposal, it's said to be a 900MW centre with its emergence raising serious questions for Wagga Wagga residents.
The data centre discussion starts at 39 mins.
How Data Centres Could Hike Power Bills by $40 Billion
A concerning new report from the Smart Energy Council (October 2026) warns that Australia's rapid data centre expansion could significantly increase electricity costs for households and businesses.
The report models a scenario in which 5 gigawatts of additional data centre demand connects to the electricity grid before sufficient new generation and storage are available.The potential impact on NSW is alarming:- $8.9 billion in additional wholesale electricity costs across NSW over six years.
- $2.05 billion in additional electricity costs for NSW households collectively.
- $543 extra on a typical NSW household's electricity bills over six years.
- Separate modelling cited in the report indicates NSW wholesale electricity prices could be 26% higher by 2035 without sufficient new renewable generation and storage to match data centre demand.The report warns that when data centres connect before adequate new electricity supplies are available, households and businesses can face higher prices as they compete for existing generation.What does this mean for Wagga Wagga?With CDC proposing a massive 1.4 GW data centre at Gregadoo, the question is whether its electricity demand could contribute to these wider pressures — and what safeguards would prevent local households and businesses from bearing additional costs.Importantly, these figures represent modelled scenarios across the electricity market, not confirmed price increases or costs attributable specifically to the Gregadoo proposal.The findings raise serious questions about who ultimately pays for Australia's data centre expansion.Read the report and examine the information for yourself.
Help Us Take Action
STOP THE GREGADOO DATA CENTREProtect Gregadoo's rural landscape, our homes, our environment, our farmland, and Wagga Wagga's future.
Raise Your Voice
Contact the people who are meant to speak on our behalf and let them know you oppose the project.
Help Spread the Word
Stopping this proposal will take more than signatures and emails. If you have time, resources, skills or connections that could help us reach more people, we’d love to hear from you.Whether you can help distribute flyers, print signage, display a poster at your business, or have another way you think you can contribute — every bit of help matters.Get in touch. We'd love to hear from you.